Video Ninety five feet of concrete creating a smooth passage between Bearle and Tilden.

Concrete will be poured to fill a 15-foot wide by 95-foot long area between Bearle and Tilden, totaling 95 feet of material. The Street and Bridge Division is responsible for the regular repair and maintenance of Pasadena’s streets, ensuring safe and efficient infrastructure. This project is part of their ongoing efforts to enhance and maintain the city’s roadways.
Pouring 95 feet of concrete between Bearle and Tilden. The concrete will fill a space 15 feet wide by 95 feet long. The Street and Bridge Division regularly repairs and maintains Pasadena’s streets.

Pasadena Channel YouTube